Jobs on TAL
All jobsOnsiteEngineeringenergy and industrial infrastructureExperience not specified
OnsiteLeadenergy and industrial infrastructure

Lead System Engineer

GE VernovaChennai, Tamil Nadu, IndiaPosted 19 May 2026

GE Vernova is hiring a Lead Systems Engineer for their Chennai location. The role involves managing product and system requirements, performing component integration, and conducting validation activities. The position requires strong problem-solving skills and the ability to interface between customers and internal teams. It is a technical role focusing on the entire lifecycle of industrial systems from design to operation.

Matched by TAL

50k new jobs listed every day. Install TAL to find more jobs like this.

Install TAL

Experience

Experience not specified

Function

Engineering

Work mode

Onsite, India

Company

Tier 2

What you will work on

GE Vernova is hiring a Lead Systems Engineer for their Chennai location. The role involves managing product and system requirements, performing component integration, and conducting validation activities. The position requires strong problem-solving skills and the ability to interface between customers and internal teams. It is a technical role focusing on the entire lifecycle of industrial systems from design to operation.

TAL's take

Quality 60/1003/5 clarityTier 2 company

Solid role at a large, well-known industrial engineering firm with clear scope for systems integration.

The role describes standard systems engineering functions but lacks specific technical stack details.

Salaries at GE Vernova

23.3 LPA average

Based on 12 Grapevine salary entries for GE Vernova.

View all salaries

Other roles

2 - 4 years | PB1

18 LPA average

Range: 18 - 19 LPA

Other roles

4 - 6 years | L

19 LPA average

Range: 16 - 21 LPA

Other roles

6 - 8 years

25 LPA average

Range: 25 - 25 LPA

Other roles

12 - 14 years | Senior Professional

32 LPA average

Range: 18 - 46 LPA

Must haves

  • Bachelors degree or equivalent
  • Experience in system integration
  • Ability to define product requirements
  • Strong interpersonal and leadership skills
  • Knowledge of system validation and verification

About the company

GE Vernova is a major multinational industrial company, though it is not a pure software product firm.

Posts mentioning GE Vernova

India and U.S. Seal $3.5 Billion Armed UAVs Deal

- India and the U.S. have finalized a $3.5 billion deal for 31 MQ-9B armed High Altitude Long Endurance (HALE) Unmanned Aerial Vehicles (UAVs). - The deal includes 170 AGM-114R Hellfire missiles, 16 M36E9 Hellfire captive air training missiles, 310 GBU-39B/B laser Small Diameter Bombs (SDB), and 08 GBU-39B/B LSDB guided test vehicles. - These advanced UAVs will significantly enhance India’s Intelligence, Surveillance, and Reconnaissance (ISR) capabilities. - As part of the deal, General Atomics will establish a Global Maintenance, Repair and Overhaul (MRO) facility in India. - Another high-profile deal pending with the U.S. is the local license manufacture of General Electric (GE) F414 jet engines by Hindustan Aeronautics Limited (HAL) for the indigenous Light Combat Aircraft (LCA) -Mk1A. Source: [The Hindu](https://www.thehindu.com/news/national/india-to-procure-31-predator-long-endurance-drones-from-us/article68755738.ece)

News Discussion92

India Penalizes GE for Jet Engine Delays

- **India** to impose penalties on **General Electric Co.** for severe delays in jet engine deliveries. - Delivery of **F404 engines** for **Tejas Light Combat Aircraft** pushed to **March 2025**. - Delay impacts **Modi's plans** for domestic fighter jet production amid tense relations with **China** and **Pakistan**. - **GE** cites **supply chain pressures**; 15 suppliers involved in disruptions. - India's fighter jet fleet dwindling as **Soviet-era aircraft** retire. Source: [Mint](https://www.livemint.com/industry/manufacturing/govt-to-impose-penalties-on-ge-electric-over-delay-in-delivery-of-fighter-jet-engines-for-tejas-airfcrafts-11730203871475.html), [Hindustan Times](https://www.hindustantimes.com/business/india-to-slap-penalties-on-general-electric-over-fighter-jet-engines-delay-101730197150554.html)

News Discussion30

GE Delivers First Engine for Tejas Mk-1A Fighters

- GE delivers the first of 99 engines for Tejas Mk-1A fighters after a two-year delay. - HAL to ramp up production of the indigenous jet, addressing developmental issues. - IAF chief criticizes HAL for delays, stressing the need for 40 new fighters annually. - GE restarted the F-404 production line, overcoming pandemic-related challenges. - HAL aims to produce 24 Tejas jets annually with a new production line in Nashik. Source: [The Times Of India](https://timesofindia.indiatimes.com/india/hal-to-shed-jet-lag-step-up-tejas-mk-1a-output-as-first-ge-engine-lands/articleshow/119567616.cms), [Hindustan Times](https://www.hindustantimes.com/india-news/ge-delivers-first-of-the-99-f-404-engines-for-lca-mk-1a-aircraft-101743014937116.html)

News Discussion20