Jobs on TAL
All jobsOnsiteEngineeringsemiconductor12+ yearsarm-based systems
OnsiteStaff/Principal/Architectsemiconductor

SoC Chip Lead

Texas InstrumentsBengaluru, Karnataka, IndiaPosted 18 May 2026

Texas Instruments is seeking a SoC Chip Lead in Bengaluru to own the end-to-end delivery of an industrial ASIC. The role involves managing the full SoC lifecycle from architecture and RTL design to mass production and post-silicon validation. Candidates require deep expertise in ARM-based systems, low-power design, and multi-domain leadership experience. This position offers a key opportunity to influence high-growth industrial markets and shape the future of intelligent systems.

Matched by TAL

50k new jobs listed every day. Install TAL to find more jobs like this.

Install TAL

Experience

12+ years

Function

Engineering

Work mode

Onsite, India

Company

Tier 1

What you will work on

Texas Instruments is seeking a SoC Chip Lead in Bengaluru to own the end-to-end delivery of an industrial ASIC. The role involves managing the full SoC lifecycle from architecture and RTL design to mass production and post-silicon validation. Candidates require deep expertise in ARM-based systems, low-power design, and multi-domain leadership experience. This position offers a key opportunity to influence high-growth industrial markets and shape the future of intelligent systems.

TAL's take

Quality 80/1005/5 clarityTier 1 company

Strong tier-1 semiconductor company with well-scoped, high-impact ownership of an industrial ASIC program.

Crisp JD with clear responsibilities, tech stack, and lifecycle ownership expectations.

Salaries at Texas Instruments

28.5 LPA average

Based on 39 Grapevine salary entries for Texas Instruments.

View all salaries

Engineering

0 - 2 years | L 24

18 LPA average

Range: 10 - 22 LPA

Engineering

2 - 4 years | SDE 1

20 LPA average

Range: 19 - 22 LPA

Design

0 - 2 years | L 24

20 LPA average

Range: 20 - 20 LPA

Other roles

0 - 2 years | L 24

19 LPA average

Range: 3 - 35 LPA

Must haves

  • 12 years experience in complex SoC/ASIC development
  • Leadership experience in multiple SoC domains
  • Expertise in ARM-based systems and low-power design
  • End-to-end SoC lifecycle exposure including RTL to PnR
  • Strong pre- and post-silicon debug skills

Tools and skills

arm-based systemsinterconnectslow-power designclock/reset/power architecturertlpnrtiming closurepre-silicon sign-offpost-silicon validation

Nice to have: t28 node, industrial soc.

About the company

Texas Instruments is a major global semiconductor corporation.

Posts mentioning Texas Instruments

Need referral for SDE 1 at Rippling

Hi all, I am currently working as a Embedded Software Engineer at Texas Instruments(YoE: 1 year) and I want to work as a SDE. I saw a opening for SDE 1 at Rippling (link: https://ats.rippling.com/rippling/jobs/4c3bce21-1608-4520-9d41-a8d45bd8f4ab?jobSite=LinkedIn) If anyone is willing to refer me, please let me know in the comments or in DM. I will share my details and resume with you. Thank you

Software Engineers40

India Penalizes GE for Jet Engine Delays

- **India** to impose penalties on **General Electric Co.** for severe delays in jet engine deliveries. - Delivery of **F404 engines** for **Tejas Light Combat Aircraft** pushed to **March 2025**. - Delay impacts **Modi's plans** for domestic fighter jet production amid tense relations with **China** and **Pakistan**. - **GE** cites **supply chain pressures**; 15 suppliers involved in disruptions. - India's fighter jet fleet dwindling as **Soviet-era aircraft** retire. Source: [Mint](https://www.livemint.com/industry/manufacturing/govt-to-impose-penalties-on-ge-electric-over-delay-in-delivery-of-fighter-jet-engines-for-tejas-airfcrafts-11730203871475.html), [Hindustan Times](https://www.hindustantimes.com/business/india-to-slap-penalties-on-general-electric-over-fighter-jet-engines-delay-101730197150554.html)

News Discussion30

GE Delivers First Engine for Tejas Mk-1A Fighters

- GE delivers the first of 99 engines for Tejas Mk-1A fighters after a two-year delay. - HAL to ramp up production of the indigenous jet, addressing developmental issues. - IAF chief criticizes HAL for delays, stressing the need for 40 new fighters annually. - GE restarted the F-404 production line, overcoming pandemic-related challenges. - HAL aims to produce 24 Tejas jets annually with a new production line in Nashik. Source: [The Times Of India](https://timesofindia.indiatimes.com/india/hal-to-shed-jet-lag-step-up-tejas-mk-1a-output-as-first-ge-engine-lands/articleshow/119567616.cms), [Hindustan Times](https://www.hindustantimes.com/india-news/ge-delivers-first-of-the-99-f-404-engines-for-lca-mk-1a-aircraft-101743014937116.html)

News Discussion20