Lead Systems Engineer - Systems Studies
GE Vernova is seeking a Lead Systems Engineer to design cost-effective HVDC installation solutions. The role involves performing insulation coordination, network studies, reliability analysis, and developing industrialization tools for power electronics. Candidates require expertise in power system engineering, simulation tools like PSCAD and MATLAB, and HVDC system design. This lead-level position requires mentoring other engineers and driving technical improvements.
50k new jobs listed every day. Install TAL to find more jobs like this.

Experience
Experience not specified
Function
Engineering
Work mode
Onsite, India
Company
Tier 2
What you will work on
GE Vernova is seeking a Lead Systems Engineer to design cost-effective HVDC installation solutions. The role involves performing insulation coordination, network studies, reliability analysis, and developing industrialization tools for power electronics. Candidates require expertise in power system engineering, simulation tools like PSCAD and MATLAB, and HVDC system design. This lead-level position requires mentoring other engineers and driving technical improvements.
TAL's take
Established industrial leader with clear, high-complexity technical domain scope for a lead engineer.
Highly specific engineering role with clearly defined simulation and system design responsibilities.
Salaries at GE Vernova
23.3 LPA average
Based on 12 Grapevine salary entries for GE Vernova.
Other roles
2 - 4 years | PB1
18 LPA average
Range: 18 - 19 LPA
Other roles
4 - 6 years | L
19 LPA average
Range: 16 - 21 LPA
Other roles
6 - 8 years
25 LPA average
Range: 25 - 25 LPA
Other roles
12 - 14 years | Senior Professional
32 LPA average
Range: 18 - 46 LPA
Must haves
- Engineering degree including power systems and power electronics
- Proven experience in power system engineering
- Knowledge of PSCAD, PSS/E, DigSilent, RTDS and MATLAB
- Expertise in insulation coordination and HVDC system design
Tools and skills
Nice to have: filter design.
About the company
Global established industrial engineering company.
Posts mentioning GE Vernova
India and U.S. Seal $3.5 Billion Armed UAVs Deal
- India and the U.S. have finalized a $3.5 billion deal for 31 MQ-9B armed High Altitude Long Endurance (HALE) Unmanned Aerial Vehicles (UAVs). - The deal includes 170 AGM-114R Hellfire missiles, 16 M36E9 Hellfire captive air training missiles, 310 GBU-39B/B laser Small Diameter Bombs (SDB), and 08 GBU-39B/B LSDB guided test vehicles. - These advanced UAVs will significantly enhance India’s Intelligence, Surveillance, and Reconnaissance (ISR) capabilities. - As part of the deal, General Atomics will establish a Global Maintenance, Repair and Overhaul (MRO) facility in India. - Another high-profile deal pending with the U.S. is the local license manufacture of General Electric (GE) F414 jet engines by Hindustan Aeronautics Limited (HAL) for the indigenous Light Combat Aircraft (LCA) -Mk1A. Source: [The Hindu](https://www.thehindu.com/news/national/india-to-procure-31-predator-long-endurance-drones-from-us/article68755738.ece)
India Penalizes GE for Jet Engine Delays
- **India** to impose penalties on **General Electric Co.** for severe delays in jet engine deliveries. - Delivery of **F404 engines** for **Tejas Light Combat Aircraft** pushed to **March 2025**. - Delay impacts **Modi's plans** for domestic fighter jet production amid tense relations with **China** and **Pakistan**. - **GE** cites **supply chain pressures**; 15 suppliers involved in disruptions. - India's fighter jet fleet dwindling as **Soviet-era aircraft** retire. Source: [Mint](https://www.livemint.com/industry/manufacturing/govt-to-impose-penalties-on-ge-electric-over-delay-in-delivery-of-fighter-jet-engines-for-tejas-airfcrafts-11730203871475.html), [Hindustan Times](https://www.hindustantimes.com/business/india-to-slap-penalties-on-general-electric-over-fighter-jet-engines-delay-101730197150554.html)
GE Delivers First Engine for Tejas Mk-1A Fighters
- GE delivers the first of 99 engines for Tejas Mk-1A fighters after a two-year delay. - HAL to ramp up production of the indigenous jet, addressing developmental issues. - IAF chief criticizes HAL for delays, stressing the need for 40 new fighters annually. - GE restarted the F-404 production line, overcoming pandemic-related challenges. - HAL aims to produce 24 Tejas jets annually with a new production line in Nashik. Source: [The Times Of India](https://timesofindia.indiatimes.com/india/hal-to-shed-jet-lag-step-up-tejas-mk-1a-output-as-first-ge-engine-lands/articleshow/119567616.cms), [Hindustan Times](https://www.hindustantimes.com/india-news/ge-delivers-first-of-the-99-f-404-engines-for-lca-mk-1a-aircraft-101743014937116.html)