Jobs on TAL
All jobsOnsiteOperationsenergy and industrial infrastructure3+ years
OnsiteMid Levelenergy and industrial infrastructure

Shift Supervisor (Shared Services)

GE VernovaSingaporePosted 20 May 2026

GE Vernova is seeking a Shift Supervisor for their industrial gas turbine component repair facility in Singapore. The role involves overseeing night shift operations, including inspection, chemical stripping, and thermal spraying processes. You will lead a team of technicians, manage manpower, and ensure safety, quality, and delivery metrics are met. This role requires a background in manufacturing engineering and experience in team supervision.

Matched by TAL

50k new jobs listed every day. Install TAL to find more jobs like this.

Install TAL

Experience

3+ years

Function

Operations

Work mode

Onsite, Singapore

Company

Tier 2

What you will work on

GE Vernova is seeking a Shift Supervisor for their industrial gas turbine component repair facility in Singapore. The role involves overseeing night shift operations, including inspection, chemical stripping, and thermal spraying processes. You will lead a team of technicians, manage manpower, and ensure safety, quality, and delivery metrics are met. This role requires a background in manufacturing engineering and experience in team supervision.

TAL's take

Quality 60/1005/5 clarityTier 2 company

Solid tier-2 role in industrial operations with clear supervisory responsibilities.

Clear and well-defined operational scope focusing on night shift management in a manufacturing environment.

Salaries at GE Vernova

23.3 LPA average

Based on 12 Grapevine salary entries for GE Vernova.

View all salaries

Other roles

2 - 4 years | PB1

18 LPA average

Range: 18 - 19 LPA

Other roles

4 - 6 years | L

19 LPA average

Range: 16 - 21 LPA

Other roles

6 - 8 years

25 LPA average

Range: 25 - 25 LPA

Other roles

12 - 14 years | Senior Professional

32 LPA average

Range: 18 - 46 LPA

Must haves

  • Degree or Diploma in Mechanical, Manufacturing, or Industrial Engineering
  • Minimum 3 years experience in a manufacturing environment
  • Team lead or supervisory responsibilities
  • Ability to work night shifts
  • Ability to respond promptly to operational emergencies

About the company

GE Vernova is a major global industrial energy firm.

Posts mentioning GE Vernova

India and U.S. Seal $3.5 Billion Armed UAVs Deal

- India and the U.S. have finalized a $3.5 billion deal for 31 MQ-9B armed High Altitude Long Endurance (HALE) Unmanned Aerial Vehicles (UAVs). - The deal includes 170 AGM-114R Hellfire missiles, 16 M36E9 Hellfire captive air training missiles, 310 GBU-39B/B laser Small Diameter Bombs (SDB), and 08 GBU-39B/B LSDB guided test vehicles. - These advanced UAVs will significantly enhance India’s Intelligence, Surveillance, and Reconnaissance (ISR) capabilities. - As part of the deal, General Atomics will establish a Global Maintenance, Repair and Overhaul (MRO) facility in India. - Another high-profile deal pending with the U.S. is the local license manufacture of General Electric (GE) F414 jet engines by Hindustan Aeronautics Limited (HAL) for the indigenous Light Combat Aircraft (LCA) -Mk1A. Source: [The Hindu](https://www.thehindu.com/news/national/india-to-procure-31-predator-long-endurance-drones-from-us/article68755738.ece)

News Discussion92

India Penalizes GE for Jet Engine Delays

- **India** to impose penalties on **General Electric Co.** for severe delays in jet engine deliveries. - Delivery of **F404 engines** for **Tejas Light Combat Aircraft** pushed to **March 2025**. - Delay impacts **Modi's plans** for domestic fighter jet production amid tense relations with **China** and **Pakistan**. - **GE** cites **supply chain pressures**; 15 suppliers involved in disruptions. - India's fighter jet fleet dwindling as **Soviet-era aircraft** retire. Source: [Mint](https://www.livemint.com/industry/manufacturing/govt-to-impose-penalties-on-ge-electric-over-delay-in-delivery-of-fighter-jet-engines-for-tejas-airfcrafts-11730203871475.html), [Hindustan Times](https://www.hindustantimes.com/business/india-to-slap-penalties-on-general-electric-over-fighter-jet-engines-delay-101730197150554.html)

News Discussion30

GE Delivers First Engine for Tejas Mk-1A Fighters

- GE delivers the first of 99 engines for Tejas Mk-1A fighters after a two-year delay. - HAL to ramp up production of the indigenous jet, addressing developmental issues. - IAF chief criticizes HAL for delays, stressing the need for 40 new fighters annually. - GE restarted the F-404 production line, overcoming pandemic-related challenges. - HAL aims to produce 24 Tejas jets annually with a new production line in Nashik. Source: [The Times Of India](https://timesofindia.indiatimes.com/india/hal-to-shed-jet-lag-step-up-tejas-mk-1a-output-as-first-ge-engine-lands/articleshow/119567616.cms), [Hindustan Times](https://www.hindustantimes.com/india-news/ge-delivers-first-of-the-99-f-404-engines-for-lca-mk-1a-aircraft-101743014937116.html)

News Discussion20