Jobs on TAL
All jobsOnsiteEngineeringenergy and industrial infrastructureExperience not specifiedpscad
OnsiteMid Levelenergy and industrial infrastructure

Systems Engineer – Systems Studies

GE VernovaNoida, Uttar Pradesh, IndiaPosted 21 May 2026

GE Vernova is seeking a Systems Engineer for their power systems studies team in Noida. The role involves performing steady-state and EMT simulations, insulation coordination, and network interaction analysis for HVDC projects. Candidates must have an engineering degree and expertise in power system modeling tools. The position requires strong problem-solving skills and technical communication to support complex energy infrastructure tenders.

Matched by TAL

50k new jobs listed every day. Install TAL to find more jobs like this.

Install TAL

Experience

Experience not specified

Function

Engineering

Work mode

Onsite, India

Company

Tier 2

What you will work on

GE Vernova is seeking a Systems Engineer for their power systems studies team in Noida. The role involves performing steady-state and EMT simulations, insulation coordination, and network interaction analysis for HVDC projects. Candidates must have an engineering degree and expertise in power system modeling tools. The position requires strong problem-solving skills and technical communication to support complex energy infrastructure tenders.

TAL's take

Quality 65/1005/5 clarityTier 2 company

Solid tier-2 industrial engineering role with clear technical scope and well-defined simulation-based responsibilities.

The JD provides a clear list of specific power system simulation tools and technical responsibilities, leaving little ambiguity regarding the core work.

Salaries at GE Vernova

23.3 LPA average

Based on 12 Grapevine salary entries for GE Vernova.

View all salaries

Other roles

2 - 4 years | PB1

18 LPA average

Range: 18 - 19 LPA

Other roles

4 - 6 years | L

19 LPA average

Range: 16 - 21 LPA

Other roles

6 - 8 years

25 LPA average

Range: 25 - 25 LPA

Other roles

12 - 14 years | Senior Professional

32 LPA average

Range: 18 - 46 LPA

Must haves

  • Engineering degree including power systems and power electronics
  • Experience in power system engineering
  • Knowledge of PSCAD, PSS/E, DigSilent, RTDS and MATLAB
  • Insulation co-ordination and main equipment characteristics for HVDC
  • Ability to perform steady-state and EMT studies

Tools and skills

pscadpss/edigsilentrtdsmatlab

Nice to have: hvdc/facts design, iec/ieee standards.

About the company

GE Vernova is a major established player in the energy infrastructure sector, qualifying as a strong Tier 2 engineering organization.

Posts mentioning GE Vernova

India and U.S. Seal $3.5 Billion Armed UAVs Deal

- India and the U.S. have finalized a $3.5 billion deal for 31 MQ-9B armed High Altitude Long Endurance (HALE) Unmanned Aerial Vehicles (UAVs). - The deal includes 170 AGM-114R Hellfire missiles, 16 M36E9 Hellfire captive air training missiles, 310 GBU-39B/B laser Small Diameter Bombs (SDB), and 08 GBU-39B/B LSDB guided test vehicles. - These advanced UAVs will significantly enhance India’s Intelligence, Surveillance, and Reconnaissance (ISR) capabilities. - As part of the deal, General Atomics will establish a Global Maintenance, Repair and Overhaul (MRO) facility in India. - Another high-profile deal pending with the U.S. is the local license manufacture of General Electric (GE) F414 jet engines by Hindustan Aeronautics Limited (HAL) for the indigenous Light Combat Aircraft (LCA) -Mk1A. Source: [The Hindu](https://www.thehindu.com/news/national/india-to-procure-31-predator-long-endurance-drones-from-us/article68755738.ece)

News Discussion92

India Penalizes GE for Jet Engine Delays

- **India** to impose penalties on **General Electric Co.** for severe delays in jet engine deliveries. - Delivery of **F404 engines** for **Tejas Light Combat Aircraft** pushed to **March 2025**. - Delay impacts **Modi's plans** for domestic fighter jet production amid tense relations with **China** and **Pakistan**. - **GE** cites **supply chain pressures**; 15 suppliers involved in disruptions. - India's fighter jet fleet dwindling as **Soviet-era aircraft** retire. Source: [Mint](https://www.livemint.com/industry/manufacturing/govt-to-impose-penalties-on-ge-electric-over-delay-in-delivery-of-fighter-jet-engines-for-tejas-airfcrafts-11730203871475.html), [Hindustan Times](https://www.hindustantimes.com/business/india-to-slap-penalties-on-general-electric-over-fighter-jet-engines-delay-101730197150554.html)

News Discussion30

GE Delivers First Engine for Tejas Mk-1A Fighters

- GE delivers the first of 99 engines for Tejas Mk-1A fighters after a two-year delay. - HAL to ramp up production of the indigenous jet, addressing developmental issues. - IAF chief criticizes HAL for delays, stressing the need for 40 new fighters annually. - GE restarted the F-404 production line, overcoming pandemic-related challenges. - HAL aims to produce 24 Tejas jets annually with a new production line in Nashik. Source: [The Times Of India](https://timesofindia.indiatimes.com/india/hal-to-shed-jet-lag-step-up-tejas-mk-1a-output-as-first-ge-engine-lands/articleshow/119567616.cms), [Hindustan Times](https://www.hindustantimes.com/india-news/ge-delivers-first-of-the-99-f-404-engines-for-lca-mk-1a-aircraft-101743014937116.html)

News Discussion20