Jobs on TAL
All jobsOnsiteEngineeringb2b saas8-16 yearsjava
OnsiteStaff/Principal/Architectb2b saas

Fullstack Java Architect / Lead

Grid Dynamicsmulti, Karnataka, IndiaPosted 19 May 2026

Grid Dynamics is seeking a Fullstack Java Architect to design and maintain enterprise-level software systems in a consulting environment. The role involves hands-on development using Java, Spring Boot, microservices, and cloud technologies alongside Angular or React. You will provide technical leadership, mentor junior developers, and drive architectural strategy. The position requires 8-16 years of experience and is based in Bengaluru or Hyderabad.

Matched by TAL

50k new jobs listed every day. Install TAL to find more jobs like this.

Install TAL

Experience

8-16 years

Function

Engineering

Work mode

Onsite, India

Company

Tier 2

What you will work on

Grid Dynamics is seeking a Fullstack Java Architect to design and maintain enterprise-level software systems in a consulting environment. The role involves hands-on development using Java, Spring Boot, microservices, and cloud technologies alongside Angular or React. You will provide technical leadership, mentor junior developers, and drive architectural strategy. The position requires 8-16 years of experience and is based in Bengaluru or Hyderabad.

TAL's take

Quality 65/1005/5 clarityTier 2 company

Solid role at an established technology consulting firm with clear architectural and leadership responsibilities.

Clear architectural focus with defined tech stack and leadership requirements.

Salaries at Grid Dynamics

11.5 LPA average

Based on 2 Grapevine salary entries for Grid Dynamics.

View all salaries

Other roles

0 - 2 years | T1

7 LPA average

Range: 7 - 7 LPA

Other roles

4 - 6 years | L2

16 LPA average

Range: 16 - 16 LPA

Must haves

  • 8-16 years of experience
  • Hands-on experience with Java and Spring Boot
  • Experience with microservices architecture
  • Proficiency in Cloud technologies
  • Front-end experience with Angular or React

Tools and skills

javaspringbootmicroservicescloudangularreact

About the company

Established technology consulting and engineering firm with global presence.

Posts mentioning Grid Dynamics

Cuba Faces Nationwide Blackout Crisis

- **Cuba** experienced a **nationwide blackout** on Friday after a major power plant failure, affecting **10 million** people. - The government implemented **emergency measures** like suspending classes and shutting down state-owned workplaces. - The blackout, starting Thursday, saw **1.64 gigawatts** go offline, about **50%** of the country's demand. - Prime Minister **Manuel Marrero** addressed the nation, citing increased demand and old plant breakdowns as causes. - The government plans to invest in **renewable energy** with **26 solar farms** under construction. Source: [Outlook](https://www.outlookindia.com/international/cuba-suffers-nationwide-blackout-as-its-main-power-plant-fails), [Times Now News](https://www.timesnownews.com/world/cuba-goes-dark-as-power-grid-failure-leaves-10-million-in-total-blackoutvideos-emerge-article-114360024)

News Discussion40

Power Grid's Strategic Acquisitions Boost India's Power Infrastructure

- Power Grid Corporation of India announced three major acquisitions worth Rs 43.73 crore. - Acquired Banaskantha Transco Limited to enhance transformation capacity in Gujarat. - Acquired Kurnool-IV Transmission to strengthen power infrastructure in southern India. - Acquired Rajasthan V Power Transmission to improve power evacuation from renewable energy zones. - All projects will be developed under the BOOT (Build, Own, Operate, and Transfer) model. Source: [The Economic Times](https://economictimes.indiatimes.com/markets/stocks/news/power-grid-shares-in-focus-after-acquisition-of-3-project-spvs-for-nearly-rs-44-cr/articleshow/119454449.cms), [Mint](https://www.livemint.com/market/stock-market-news/stocks-to-watch-power-grid-hcl-tech-easemytrip-rvnl-nhpc-among-shares-in-focus-today-11742865518510.html)

News Discussion20

Cuba Faces Second Island-Wide Blackout

- **Cuba** experienced a second **island-wide blackout** after partial restoration of electricity. - Millions are struggling to stay cool and find food amidst ongoing **power outages**. - **State-run media** reported a complete disconnection from the national electro energetic system at 6:15 a.m. - **Government efforts** to re-establish power are ongoing, with limited stores and markets operating. - **Economic crisis** and **U.S. embargo** are cited as major factors contributing to the blackouts and shortages. Source: [Nbc News](https://www.msnbc.com/weekends-with-alex-witt/watch/cuba-hit-with-second-blackout-amid-national-power-grid-failure-222187589816), [Nbc 4 New York](https://www.nbcnewyork.com/news/national-international/cubas-power-outage/5904032/)

News Discussion10